FREYROM S.A. was founded in Romania in 1996, as part of Freyssinet International & Cie.Group, contributing by promoting new Freyssinet technologies to the development of the construction and rehabilitation of bridges, overpasses, viaducts, as well as in the civil and industrial construction sector.

  • + 500
    Infrastructure projects
  • + 28
    years of experience
What we do

NEW BUILD  

what we do

Repair  

OUR REFERENCES

NEW BUILD
Romania

Supply and installation of post-tensioning systems

Post-tensioning systems have been successfully implemented in numerous projects of works of art, civil and industrial constructions, using state-of-the-art materials and equipments.
The use of post-tensioned slabs allows the reduction of the weight of the superstructure and, consequently, of the seismic loads. Also, this method of execution significantly reduces the execution times due to the simple way of realising the formworks and the active and passive reinforcement.
NEW BUILD
Cluj-Napoca

Bridge over the Somesul Mic river on Portelanului Street (Portelanului Bridge)

The works on this project consisted in the construction of a new bridge with a 54 lm single span. The technical solution adopted was 'Warren truss' beams, with one lane in each direction, sidewalks, bicycle lanes, as well as re-profiling and embankment works. The project included also a new energy efficient street and architectural lighting and reorganisation of the adjacent areas.
NEW BUILD
Oradea

Sustainable Urban Mobility Corridor in "Emanuil Gojdu" Square Oradea - Stage I

The works on this project consisted in the construction of 6 underpasses, 12.117 square metres of sidewalks, 660 linear metres of bicycle lanes, 990 linear metres of lanes for public transport, upgraded road infrastructure, upgraded tram lines, new construction and upgraded transport stations, as well as trees planting, shrubs and new irrigation networks.
The overall aim of the project is to reduce carbon emissions in Oradea by creating a sustainable urban mobility corridor.
NEW BUILD
Oradea

Sustainable Urban Mobility Corridor in "Emanuil Gojdu" Square Oradea - Stage II

The works on this project have solved the traffic deficiencies that significantly affected the public transport, their location being the meeting point for more than 80% of tram and bus routes in Oradea.
The works on this project consisted also in the realization of roundabouts crossed by an underpass with a length of 33.7 lm, road infrastructure works that intersect with the tram lines, utilities undercrossings, lighting and landscaping works.
NEW BUILD
Cluj-Napoca

Bridge over the Somesul Mic river, connection between Oasului Street and Rasaritului Street

The works on this project consisted in the construction of a bridge with a single span of 48.10 lm, arches and tie rods, carrigeway at the bottom and two sections of road, with a total length of 216 lm, including the roadway, sidewalks and bicycle lanes.
The construction of the bridge and the arrangement of the junctions related to the bridge have contributed to the fluidisation of the traffic, decongestion of the junctions in the area, as well as realization of economic and recreational activities in the parks in the area.
NEW BUILD
SATU MARE

Pedestrian and velo bridge over the Somes river in Satu Mare municipality

The works on this project consisted in the construction of a pedestrian and velo bridge in tied-arch system, carrigeway at the bottom and 2 side spans.
The aim of the project was to create a coherent network of bicycle lanes and to modernise the pedestrian routes, in order to sustainably transfer part of the modal share from private to public transport.
NEW BUILD
DEFILEUL JIULUI

Bridge construction over Jiu de la Meri and DN66 rehabilitation km 106+220 - km 106+965

The works on this project consisted in the construction of a new monolith arch bridge, carrigeway at the top, the first one built in Romania in the past 30 years, as well as the execution of retrofitt works for the road sector DN66 in the area of Lainici Monastery.
By optimizing the initial solution numerous benefits were brought to the project, including fitting into the specific style of the area, the decrease of the carbon footprint and the increase of the durability of the works because the materials used have a durability of over 100 years.
NEW BUILD
Bucharest

Virtutii - Nod Ciurel bridge

Virtutii - Nod Ciurel bridge is a complex infrastructure construction, which consists of a cable-stayed bridge over the Dambovita river, 2 overpasses over the Virtutii road and a ground level bridge over the Dambovita River and 9 road connections.
The works on this project consisted in the supply and installation of the FREYSSINET H2000 stay-cable system with 48 cables and the execution of post-tensioning works of the deck.
NEW BUILD
Oradea

Innovative solution green light tramway lane project Dacia Bridge - Magheru Boulevard, Oradea

The works on this project consisted in construction of an underpass bridge under Bd. Magheru, 2 access ramps, rehabilitation works at Dacia bridge, tramway and road works.
The scope of this project was to improve the traffic flow in the area by creating a third lane on the bridge, solving the traffic problems on Bd. Magheru and prioritizing the public transport by creating a green light lane for the tram.
NEW BUILD
Oradea

Bridge construction over Crisul Repede between Plevnei street and Szigligeti Ede street

The works on this project consisted in two stages: the demolition of the old bridge and the construction of a new arch bridge with a mixed steel-concrete deck supported by tie rods and 2 roundabouts.
The construction of this bridge, also called the Centenary Bridge, is one of Freyrom landmark project.
NEW BUILD
Oradea

Overpass over Oradea's ring road, in Nojoridului street area

The works on this project consisted in the construction of an overpass over Oradea bypass, with a single span of 33 lm, ramps for the overpass and connection roads with the ring road and the adjacent streets.
In order to improve the traffic flow, the junctions between the connection roads and the adjacent streets were made through roundabout and the connection with the ring road was made through acceleration and deceleration lanes.
NEW BUILD
Poiana Sarata

Road bridge over Oituz at Poiana Sarata on DN11, km 90+450

The works on this project consisted in the demolition of the existing bridge and the construction of a new bridge with a single span of 22.4 lm and a total length of 38.87 lm.
The aim of the works was to improve the general traffic conditions and to increase the traffic safety and the speed traffic.
NEW BUILD
Agigea

Road bridge at km 0+540 of the Danube-Black Sea Canal

The works on this project consisted in the design, supply and installation of the FREYSSINET H2000 stay-cable system with 64 cables.
The purpose of building the bridge was to provide a connection between the northern and southern parts of the harbour, which were previously separated by the Danube-Black Sea Canal.
REPAIR
Romania

Framework contracts for repair and replacement of expansion joints

With a vast experience and numerous contracts for repair and replacement of expansion joints, we have replaced more than 3000 lm of expansion joints in the last 2 years alone.
REPAIR
Oradea

Rehabilitation of the reinforced concrete cable-stayed bridge over the river Crisul Repede - Intelectualilor

Intelectualilor bridge is one of the oldest cable-stayed bridge in the country and has a total length of 85.85 lm and 2 spans. The works carried out aimed to restore the mechanical resistance and the original appearance of the main elements.
REPAIR
Gaesti

Repair works at the overpass over the CF on DN61 km 77+200 at Gaesti

The repair works consisted of infrastructure lining, external post-tensioning, shotcrete repairs, slab and road system reconstruction, infrastructure, viaducts and access stairs repair works.
REPAIR
Cernavoda

Bridge repairs on DN22 C km 3+445 at Cernavoda

The repair works consisted in the dismantling and rebuilding of the entire road system including also the deck components, construction of a new concrete slab, the lining of the cracked elevations, abutments, piles, concrete repair works and embankment protection works.
REPAIR
Buzau

Periodic maintenance works at the bridge on DN2 km 114+570 (Calea 2) over Buzau

The repair works consisted of sandblasting the truss type beams, cleaning of the cross beams, application of anti-corrosive protection, demolition of concrete and repairs with special mortars, reconstruction of the road system, ramps, drains and expansion joints.
REPAIR
Alexandria

Bridge on DN6, km 85+993, over the Vedea river at Alexandria

The scope of works consisted in repair works on arches, road system, sidewalk, guard rails, expansion joints, drains, stone packings, embankment connections, access stairs and protective works on infrastructures.
REPAIR
Agigea

Bridge rehabilitation DN39 km 8+988 at Agigea, Constanta county

The scope of works for this project consisted in the dismantling of the old cables (48 parallel SBP wires protected in round metal pipes) and the supply and installation of a new retrofitting stay-cable system FREYSSINET HD1000 with external diverters and anchorages with 7 and 12 cables.
REPAIR
ANINOASA

Bridge consolidation on DN 66A km 2+178 over the West Jiul at Aninoasa

In this project works were carried out at the road system, guard rails, drains, expansion joints, ramps, embankment connections, in riverbed, replacement of tie rods and strengthening works.
REPAIR
COSMESTI

Periodic maintenance of the bridge on DN 24 km 7+358, Cosmesti bridge

The works on this project consisted of resurfacing the carriageway, new asphalt pavement, maintenance of the metal decks, repair of the water collecting system and drainage devices and new expansion joints.
REPAIR
Bucharest

Seismic retrofitting of Bucharest City Hall building through base isolation method

The retrofitt works consisted in introduction of 36 dampers and 262 seismic isolators in order to increase the earthquake resistance at 9 - 9.2 on the Richter scale. One of the main benefits of base isolation method is reducing construction execution time.